top of page
RE52yp4.jfif
IMG_2259_edited.jpg

Louie J. Patino

Senior Estimator

Cell:

817.908.6050

Email:

City / ST:

Mansfield, TX

Education:

MBA, Institute of Construction Mgmt Tech (2006)

BA, Texas Tech University, Lubbock, TX (2002)

A Bit About Me

I was raised in Midland, TX and began my construction estimating journey in my undergraduate studies at Texas Tech in 1998 by taking various construction methods courses and eventually earning my MBA in construction management from ICMT. I have worked for several earthwork & utility subcontractors & waste management companies in the DFW metroplex in Texas since 2004. I have 15 years' experience with HCSS HeavyBid, AGTEK, BlueBeam & Planswift.

 

WHAT SEPARATES AZLYNN ESTIMATING FROM OUR COMPETITORS?

​

Over the last 12 years I have developed a proprietary software which we utilize to compile quantities and 64 cost constraints and synthesize this bid data into a final bid proposal for our clients. The feedback using this methodology has been unanimous and continues to grow in effectiveness. Our bids are not only competitive and considered to be "in the hunt" on 20% of our total submitted proposals (which is above target) but we maintain a valuable relationship with many of our general contractors which provide detailed feedback on many proposals which helps us continually evaluate our processes and modify our cost constraints to ensure we are not only covering our costs but maintaining our target profit margin and identifying potential hazards from historical bids which we track the actual costs against the projected costs to ensure our accuracy rating remains above 98%.

​

Allow Azlynn Estimating the opportunity to be your estimating team and partner and you will not be disappointed. Contact us today to see how we can help your business.

Work Experience

March 2021 - Current

April 2015 - March 2021

April 2010 - Apr 2015

July 2006 - April 2010

Senior Estimator & Estimating Coordinator for Utility Sub-Contractor in Burleson, TX, performing material takeoffs utilizing Planswift and compiling quantities to develop detailed bids based on labor, equipment, production rates utilizing a proprietary software. Current Bid Volume is $325M/YR

Estimator & Sr. Project Manager for (2) Utility Construction Sub-Contractors in Irving & Haslet, TX. Utilized both HCSS HeavyBid & Planswift.

Responsibilities Included: Cost Estimating, Job Cost Tracking, Budgeting, P&L Forecasting, Contract & Change Order Negotiation & Review, Subcontractor Selection, Coordinate Daily Operations, Material Buyout, Submit RFI's, Prepare Schedules, Material Takeoff, Creating Change Orders, Pay Estimates (AIA), Submittal Compilation, Job Cost Analysis, Maintain Relationships. What set me apart was being able to provide a thorough evaluation of the necessary objectives and costs associated with various tasks required to attain a successful project both on-time and under budget.

Landfill Manager for both IESI & Waste Management (FW C&D LF Kennedale, Skyline LF Ennis, DFW LF Lewisville)

Responsibilities included: Fiscal (Budgeting, P&L Review, Capital Management, Cell Construction Planning, Permit Modification in conjunction with both the engineering & legal teams), Identify both Growth & Improvement opportunities, Client Retention, Coordinate & Administer Operations, Develop & Execute Sales Strategies, Manage Employees & Heavy Equipment Operations & Utilization, Well versed in TCEQ Environmental Compliance Standards, Airspace Utilization, Fill Sequencing, Design Layout, Storm Water Management  & Erosion Control Management. Louie was one of the first graduates from the 9 Month in-depth Landfill Manager Training Program by Waste Management in 2010.

Earthwork & Utility Estimator & Jr. Project Manager in Frisco, TX. Utilized both HCSS HeavyBid & AGTEK programs.

Responsibilities Included: Cost Estimating, Job Cost Tracking, Budgeting, Contract & Change Order Negotiation & Review, Subcontractor Selection, Coordinate Daily Operations, Material Buyout, Submit RFI's, Prepare Schedules, Material Takeoff, Creating Change Orders, Submittal Compilation, Maintain Relationships. Three of my largest projects at this time included: (1) $6.12M Aqueduct Pipe Repairs, Amarillo / 72" FRP & 78" Steel Pipe / 12,054'; (2) $6.15M 36" Water Transmission Line, CWW in Houma, LA (22,295' 36" Steel Pipe); (3) $6.27M 30-21" FRP & 15" PVC West Rowlett WW, Frisco, TX

Let's Get
Social

  • Facebook
IMG_1469.jpg
bottom of page